We are proud to have some of the biggest companies in the region amongst our clients – from Severn Trent to the Bullring, Birmingham and the region’s biggest employer Jaguar Land Rover.
Our case studies show a selection of the services we can provide.
Our case studies show a selection of the services we can provide.
UK Dairy
Central Power recently completed a major new installation for a large UK Dairy at their Telford facility as part of a £50m site expansion. As well as the increased site load, the network was redesigned to offer a greater level of resilience and redundancy.
Central Power’s site team installed 2 new Schneider electric intake switchboards and several new distribution substations comprising of Schneider Electric RN2Ds and Wilson Powers E2 super low-loss transformers.
Well done to all the guys on site who helped deliver the project to deadline. #schneiderelectric #wilsonpower #transformers #substations #power #distribution
Click here to see our linkedin post
See More
26th November 2020
Central Power recently completed a major new installation for a large UK Dairy at their Telford facility as part of a £50m site expansion. As well as the increased site load, the network was redesigned to offer a greater level of resilience and redundancy.
Central Power’s site team installed 2 new Schneider electric intake switchboards and several new distribution substations comprising of Schneider Electric RN2Ds and Wilson Powers E2 super low-loss transformers.
Well done to all the guys on site who helped deliver the project to deadline. #schneiderelectric #wilsonpower #transformers #substations #power #distribution
Click here to see our linkedin post
Civil Engineering
3rd November 2020
Central Power have expanded to incorporate civil engineering alongside our existing electrical engineering services.
This allows us to offer turn-key solutions to a wide range of projects, all managed in-house by our project engineers.
Together with cable fault location testing, it means we can offer a quick response to High Voltage underground cable faults.
Please get in touch for cable trenching & laying, High Voltage cable faults, construction of substation bases and all other electrical civil projects.
#highvoltage #civilengineering #centralpower
Click here to see our LinkedIn post.
See More
This allows us to offer turn-key solutions to a wide range of projects, all managed in-house by our project engineers.
Together with cable fault location testing, it means we can offer a quick response to High Voltage underground cable faults.
Please get in touch for cable trenching & laying, High Voltage cable faults, construction of substation bases and all other electrical civil projects.
#highvoltage #civilengineering #centralpower
Click here to see our LinkedIn post.
IAC
3rd November 2020
IAC supplies components and interior trim for Land Rover and Range Rover models in the U.K.
The Project at Prologis Park Birmingham Interchange (PPBI) consists of two buildings located at PPBI total 310,000 sq. ft.
At Central Power, we were proud to have worked with IAC to provide an 11kv ring main comprising of 5 sub stations and associated transformers.
Utilising our internal civil team we constructed transformer plinths, switchgear bases and fencing, plus on site trenching to link up with a new 11kv connection being supplied by ‘Power on Connection’ #CentralPower #Highvoltageengineers #Transformers
Click here to see our LinkedIn post.
See More
The Project at Prologis Park Birmingham Interchange (PPBI) consists of two buildings located at PPBI total 310,000 sq. ft.
At Central Power, we were proud to have worked with IAC to provide an 11kv ring main comprising of 5 sub stations and associated transformers.
Utilising our internal civil team we constructed transformer plinths, switchgear bases and fencing, plus on site trenching to link up with a new 11kv connection being supplied by ‘Power on Connection’ #CentralPower #Highvoltageengineers #Transformers
Click here to see our LinkedIn post.
HV Maintenance
It's critical to stay on top of planned maintenance and in this case the decision to inspect this cast resin transformer was just in time. The build-up in dust was bridging the insulators and if left unresolved would have resulted in catastrophic failure. #maintenance #highvoltage #transformers #centralpower
Click here to see our LinkedIn post
See More
3rd November 2020
It's critical to stay on top of planned maintenance and in this case the decision to inspect this cast resin transformer was just in time. The build-up in dust was bridging the insulators and if left unresolved would have resulted in catastrophic failure. #maintenance #highvoltage #transformers #centralpower
Click here to see our LinkedIn post
Jaguar Land Rover
2nd November 2020
We hold maintenance and responce contracts with the region’s biggest employer Jaguar Land Rover to ensure the smooth running of their operations but we are also their go to company for assistance with new power requirements and installations.
See More
Kamatsu. Worcester
2nd November 2020
After receiving an early morning call to a report of a loss of power following a fire alert in a substation, we arrived to find an old air cooled transformer had flashed over. Replacements aren’t easy to find but we worked with some of our partner companies to get a step-up transformer and appropriate generation to ensure production was not affected.
See More
Commonwealth Games 2022
2nd November 2020
All eyes will be on Birmingham in 2022 when our home city hosts the Commonwealth Games and we were thrilled to be asked to install two new substations as part of improvements at Alexander Stadium which will be at the centre of many of the track and field events.
We have recently completed a project at the Alexander Stadium in Perry Barr, relocating the existing 11kV Switchgear to enable the next phase of development for the Birmingham 2022 games. The civil work included construction of 2 concrete bases for GRP housing and installation of ducting for the cable installation.
#electricalengineering #centralpower #birmingham2022
Click here to view our linked in post.
See More
We have recently completed a project at the Alexander Stadium in Perry Barr, relocating the existing 11kV Switchgear to enable the next phase of development for the Birmingham 2022 games. The civil work included construction of 2 concrete bases for GRP housing and installation of ducting for the cable installation.
#electricalengineering #centralpower #birmingham2022
Click here to view our linked in post.
Birmingham Airport
2nd November 2020
The final stages of a recent airport project.
A great scheme to be involved with.
Central Power Engineers installed a 4 section Schneider high voltage switchboard, two 2000 kva transformers and nearly 1.2km's of HV cable (installed by our in-house civil teams), all airside!
#Centralpower #highvoltageengineering #Schneider
Click here to view on linkedin
See More
A great scheme to be involved with.
Central Power Engineers installed a 4 section Schneider high voltage switchboard, two 2000 kva transformers and nearly 1.2km's of HV cable (installed by our in-house civil teams), all airside!
#Centralpower #highvoltageengineering #Schneider
Click here to view on linkedin