02/11/2020
The final stages of a recent airport project.
A great scheme to be involved with.
Central Power Engineers installed a 4 section Schneider high voltage switchboard, two 2000 kva transformers and nearly 1.2km's of HV cable (installed by our in-house civil teams), all airside!
#Centralpower #highvoltageengineering #Schneider
Click here to view on linkedin Back to Case Studies
A great scheme to be involved with.
Central Power Engineers installed a 4 section Schneider high voltage switchboard, two 2000 kva transformers and nearly 1.2km's of HV cable (installed by our in-house civil teams), all airside!
#Centralpower #highvoltageengineering #Schneider
Click here to view on linkedin Back to Case Studies